We use cookies to provide you with a better experience. By continuing to browse the site you are agreeing to our use of cookies in accordance with our Cookie Policy.
  • INDUSTRY PRESS ROOM
  • ABOUT
  • CONTACT
  • MEDIA FILE
  • Create Account
  • Sign In
  • Sign Out
  • My Account
Free Newsletters
  • MAGAZINE
    • Current Issue
    • Archives
    • Digital Edition
    • Subscribe
    • Newsletters
    • Mobile Apps
  • TRANSPORTATION
  • MATERIAL HANDLING
  • TECHNOLOGY
  • LIFT TRUCKS
  • PODCAST ETC
    • Podcast
    • Webcasts
    • Blogs
      • One-Off Sound Off
      • Global Logistics and Risk
      • Empowering Your Performance Edge
      • Analytics & Big Data
      • Submit your blog post
    • Events
    • White Papers
    • Industry Press Room
      • Upload Your News
    • New Products
      • Upload Your Product News
    • Conference Guides
    • Conference Reports
    • Newsletters
    • Mobile Apps
  • DCV-TV
    • DCV-TV 1: News
    • DCV-TV 2: Case Studies
    • DCV-TV 3: Webcasts
    • DCV-TV 4: Viewer Contributed
    • DCV-TV 5: Solution Profiles
    • Parcel Forum 2022
    • MODEX 2022
    • Upload Your Video
  • MAGAZINE
    • Current Issue
    • Archives
    • Digital Edition
    • Subscribe
    • Newsletters
    • Mobile Apps
  • TRANSPORTATION
  • MATERIAL HANDLING
  • TECHNOLOGY
  • LIFT TRUCKS
  • PODCAST ETC
    • Podcast
    • Webcasts
    • Blogs
      • One-Off Sound Off
      • Global Logistics and Risk
      • Empowering Your Performance Edge
      • Analytics & Big Data
      • Submit your blog post
    • Events
    • White Papers
    • Industry Press Room
      • Upload Your News
    • New Products
      • Upload Your Product News
    • Conference Guides
    • Conference Reports
    • Newsletters
    • Mobile Apps
  • DCV-TV
    • DCV-TV 1: News
    • DCV-TV 2: Case Studies
    • DCV-TV 3: Webcasts
    • DCV-TV 4: Viewer Contributed
    • DCV-TV 5: Solution Profiles
    • Parcel Forum 2022
    • MODEX 2022
    • Upload Your Video
Home » Modulift Provides Below-the-Hook Solution for Bedroom Installations
Press releases are provided by companies as is and have not been edited or checked for accuracy. Any queries should be directed to the company issuing the release.

Upload your press release

Modulift Provides Below-the-Hook Solution for Bedroom Installations

May 4, 2017
No Comments

Two pioneers in modular concepts of different kinds combined to install bedrooms at the citizenM Tower of London Hotel, which offer guests views of the River Thames, Tower Bridge and a series of other famous landmarks.
Below-the-hook equipment manufacturer Modulift, a specialist provider of modular spreader beams, supplied rigging equipment as Polcom Modular installed 260 pre-fabricated structural modular bedrooms at the iconic riverside new-build.
Modular construction is fast becoming a building method of choice for organisations looking for rapid project completion, assured quality standards and minimal impact on the environment or the local area, said Ben Paget, structural director at Polcom. Polcom accepted a scope of work to design, manufacture, supply and install the bedrooms over an 11-week period, all at night.
The modules had bespoke designed lifting eyes integrated into the structural framing that were utilised by the rigging team. A bedroom-corridor module weighed approximately 8t, while the heavier bedroom-corridor-bedroom modules were around 12.5t.
Modulift provided standard MOD 24 (24t capacity at 5m / 17 ft.) and MOD 50 (50t capacity at 8m / 26 ft.) spreader beams, slings and shackles that were used in either single or one-over-two configuration depending on the lifting points on the modules; some were four-point lifts and others eight-point. Below-the-hook equipment totalled up to 1.25t in weight for each lift.
Polcom utilised a tower crane leased by Balfour Beatty, the major contractor, which was already onsite for other lifts related to the construction project. Paget explained that as the crane was sourced prior to completion of the module design, limited height was available for the top floor bedrooms.
He added: "We had to modify the top floor lift with shortened chains and tighter angles to accommodate the final lifts. The module centres of gravity positions were not quite central and we had to manually compensate some of them with sandbags. Modulift's design service was critical to successful delivery of the project, giving us access to high quality drawings, specifications and expertise, particularly beneficial in offsetting the centre of gravity positions during design of the lifting frames."
During the day, spreader beams and lifting equipment was stored in a purpose-built cage that slotted onto the top of a module, located by the lifting eyes. Polcom moved the cage up each time work started on a new floor level.
Prior to installation the modules were transported from Poland to London Thamesport, a container seaport on the River Medway, where they were placed in storage. Most could be moved under normal transport restrictions but the widest had to be accompanied by special escorts. The entire modular installation crew consisted of between six and 10 people, which included resource for site bolting of the modules as well as rigging and traffic marshalling.
Following the success of the project, Polcom has employed Modulift below-the-hook equipment and expertise on further installations in the UK, USA and Canada. Paget said six such projects are taking place at the time of publication.
He concluded: "Our modular system is designed bespoke to every project. Size and shape varies according to the architecture. Where possible we limit the overall width, length and height to standard transportation limits to avoid extra costs, but this is not always possible."

More Info: http://modulift.com

Submit your logistics, material handling, or supply chain related company news in DC VELOCITY's Industry Press Room section or New Products section
  • Related Articles

    Low Headroom Below-the-Hook System Utilizes Straightpoint Wireless Load Pin

    Modular Spreader Frame Provides Rigging Solution

    Modulift Spreader Beam Lifts 380t Towers for Offshore Project

You must login or register in order to post a comment.

Report Abusive Comment

Most Popular Articles

  • Schneider welcomes first battery-electric truck

  • Fred Smith is not worried about Amazon

  • RJW LOGISTICS GROUP EXPANDS RETAIL LOGISTICS OPERATION TO DALLAS

  • Outlook 2023: What’s in store for logistics/supply chain?

  • Maersk deploys indoor drones for warehouse inventory counts

Now Playing on DCV-TV

5afe63a5 7125 4318 b851 1e5738df1c91

Patterson Fan Co. | HVLS V-Series Ceiling Fan | Staging Area Air Movement

DCV-TV 4: Viewer Contributed
The Patterson V-Series is a high-volume, low-speed industrial ceiling fan that is designed to circulate a lot of air at a very low speed. These fans, ranging in diameters of 8’ all the way to 24’, are perfect for large, open spaces such as staging and shipping areas. One 24’ fan can generate a cooling effect of 6 –...

FEATURED WHITE PAPERS

  • The five best applications for robotic lift trucks in warehouse environments

  • Fulfillment Facility Improved Efficiencies by 4x

  • 3PLs: Complete Orders Faster with Flexible Automation

  • Reusable Packaging for the New Wave of Supply Chain Automation

View More

Subscribe to DC Velocity Magazine

GET YOUR FREE SUBSCRIPTION
  • SUBSCRIBE
  • NEWSLETTERS
  • ADVERTISING
  • CUSTOMER CARE
  • CONTACT
  • ABOUT
  • STAFF
  • PRIVACY POLICY

Copyright ©2023. All Rights ReservedDesign, CMS, Hosting & Web Development :: ePublishing