We use cookies to provide you with a better experience. By continuing to browse the site you are agreeing to our use of cookies in accordance with our Cookie Policy.
  • INDUSTRY PRESS ROOM
  • ABOUT
  • CONTACT
  • MEDIA FILE
  • Create Account
  • Sign In
  • Sign Out
  • My Account
Free Newsletters
  • MAGAZINE
    • Current Issue
    • Archives
    • Digital Edition
    • Subscribe
    • Newsletters
    • Mobile Apps
  • TRANSPORTATION
  • MATERIAL HANDLING
  • TECHNOLOGY
  • LIFT TRUCKS
  • PODCAST ETC
    • Podcast
    • Webcasts
    • Blogs
      • One-Off Sound Off
      • Global Logistics and Risk
      • Empowering Your Performance Edge
      • Analytics & Big Data
      • Submit your blog post
    • Events
    • White Papers
    • Industry Press Room
      • Upload Your News
    • New Products
      • Upload Your Product News
    • Conference Guides
    • Conference Reports
    • Newsletters
    • Mobile Apps
  • DCV-TV
    • DCV-TV 1: News
    • DCV-TV 2: Case Studies
    • DCV-TV 3: Webcasts
    • DCV-TV 4: Viewer Contributed
    • DCV-TV 5: Solution Profiles
    • Parcel Forum 2022
    • MODEX 2022
    • Upload Your Video
  • MAGAZINE
    • Current Issue
    • Archives
    • Digital Edition
    • Subscribe
    • Newsletters
    • Mobile Apps
  • TRANSPORTATION
  • MATERIAL HANDLING
  • TECHNOLOGY
  • LIFT TRUCKS
  • PODCAST ETC
    • Podcast
    • Webcasts
    • Blogs
      • One-Off Sound Off
      • Global Logistics and Risk
      • Empowering Your Performance Edge
      • Analytics & Big Data
      • Submit your blog post
    • Events
    • White Papers
    • Industry Press Room
      • Upload Your News
    • New Products
      • Upload Your Product News
    • Conference Guides
    • Conference Reports
    • Newsletters
    • Mobile Apps
  • DCV-TV
    • DCV-TV 1: News
    • DCV-TV 2: Case Studies
    • DCV-TV 3: Webcasts
    • DCV-TV 4: Viewer Contributed
    • DCV-TV 5: Solution Profiles
    • Parcel Forum 2022
    • MODEX 2022
    • Upload Your Video
Home » Stagemaker Hoists Lift Spirits on Chris Tomlin Tours
Press releases are provided by companies as is and have not been edited or checked for accuracy. Any queries should be directed to the company issuing the release.

Upload your press release

Stagemaker Hoists Lift Spirits on Chris Tomlin Tours

September 25, 2019
No Comments

Stage rigging specialist TLS Productions Inc. (TLS) has supplied Stagemaker hoists and rigging expertise for two consecutive tours for contemporary Christian music artist Chris Tomlin.
TLS, a Hibino USA company, won two separate contracts to provide the rigging equipment and a traveling head rigger for the two-month-long Worship Night In America and Holy Roar Tours, which took place during the spring months of 2018 and 2019 respectively. The 2018 tour included 24 shows, while this year's circuit ended with an iconic 28th show, the Good Friday Concert, which took place at Bridgestone Arena in Nashville, Tennessee. Jordan Yeo, production rigger / production manager at TLS, traveled with both tours.
TLS, a distributor of R&M Materials Handling Inc.'s Stagemaker entertainment range of hoists, reported to two production managers and a tour manager over two years to deliver all of the lifting equipment, steel, shackles and controls, plus a rigging workbox that stocked tools for day-to-day use on the road. Yeo himself was responsible for marking the floor and leading the local crew in rigging the shows safely.

Challenges

Yeo said: "It was a different lighting rig for both tours and each venue is different. Not all venues can hold the same amount of weight and have varying beam layouts. I took each venue's information and put our show into their building. Sometimes we had to move things around to accommodate venue-specific challenges. Each show had its own rigging plot slightly modified to each specific venue. There were times that certain elements of the show did not hang due to the size of venue."

Solutions

Over 100 hoists were used in total—57 this year, 56 last—the majority of which were Stagemakers, ranging from ¼ to 2-ton capacity. Yeo highlighted the fact that all of the hoists ran at 16 ft. per min, while the length of the chains was typically 60 ft. or 80 ft. There were varying trim heights for the rig; the lowest was 16 ft. and the audio hangs usually trimmed to 60 ft. The lighting trusses' maximum trim was 45 ft., Yeo added. Lighting trusses usually had three or four hoists moving at once and the audio main hangs had three hoists working together. The side hangs, meanwhile, had two pick-points that worked in tandem.
Stagemaker entertainment motors are designed to handle stage and theatrical equipment, enabling the safe and accurate position of speakers, lighting systems, stage sets, and sceneries. The range is lightweight, making it ideal for touring events, reducing time and improving ergonomics for riggers. Its compact size permits it to fit inside truss structures, and its quietness makes it ideal for operation during performances.
Yeo recalled the hectic schedule: "We usually chalked the floor around 8 a.m. Load-in started at 9 a.m. and we were finished with the rig up in the air between 12-1 p.m. each day. Sound check took between 2-3 p.m. Doors opened at 6 p.m. and typically the show started around 7 p.m. After performances, we were packed up and ready to move to the next venue in two-and-a-half hours."

A Good Friday

The latest tour is memorable because of the scale of the pre-rig for Tomlin's final show at Bridgestone Arena.
Pre-rigging is when the tour rigger and local riggers go in earlier than the rest of the equipment and tour personnel to hang all of the motors. Sometimes this is done a day before or a few hours in advance of the main load-in. In this case, the team chose to pre-rig due to time restraints in getting the show loaded with added elements that hadn't been on the tour previously.
Yeo said: "We added about 20 additional hoists to the Good Friday show due to the performance being almost 100% in the round. There were extra lighting trusses, video walls, and audio hangs to accommodate the seats to the sides that wrapped around the stage. The previous show was in Kansas City and I flew from there to Nashville early to be in time for the pre-rig, starting our day at 6 a.m. The timing with the driving distance was the main reason why the tour crew and gear did not show up until 11 a.m. We had 70% of the rigging done by the time the rest of the team arrived."

Submit your logistics, material handling, or supply chain related company news in DC VELOCITY's Industry Press Room section or New Products section
You must login or register in order to post a comment.

Report Abusive Comment

Most Popular Articles

  • Fred Smith is not worried about Amazon

  • Outlook 2023: What’s in store for logistics/supply chain?

  • Ports, maritime operators see tide turning as ocean freight tsunami subsides

  • In Person: Steve Beverly of Penske

  • InPerson interview: Rob McKeel of Fortna

Now Playing on DCV-TV

89cfed30 8aac 4284 960d c8c8c1886e16

Have you checked your read rate lately?

DCV-TV 4: Viewer Contributed
No reads. Unaccounted for boxes. Boxes sent to the wrong place. A logistics nightmare! But this nightmare doesn’t have to come true. SICK’s linear line scan camera is what dreams are made of for your logistics operations. And if you’re worried about motion and vibration from conveyor belts...well, there’s no reason...

FEATURED WHITE PAPERS

  • The five best applications for robotic lift trucks in warehouse environments

  • Fulfillment Facility Improved Efficiencies by 4x

  • 3PLs: Complete Orders Faster with Flexible Automation

  • Reusable Packaging for the New Wave of Supply Chain Automation

View More

Subscribe to DC Velocity Magazine

GET YOUR FREE SUBSCRIPTION
  • SUBSCRIBE
  • NEWSLETTERS
  • ADVERTISING
  • CUSTOMER CARE
  • CONTACT
  • ABOUT
  • STAFF
  • PRIVACY POLICY

Copyright ©2023. All Rights ReservedDesign, CMS, Hosting & Web Development :: ePublishing