We use cookies to provide you with a better experience. By continuing to browse the site you are agreeing to our use of cookies in accordance with our Cookie Policy.
  • ::COVID-19 COVERAGE::
  • INDUSTRY PRESS ROOM
  • ABOUT
  • CONTACT
  • MEDIA FILE
  • Create Account
  • Sign In
  • Sign Out
  • My Account
Free Newsletters
  • MAGAZINE
    • Current Issue
    • Archives
    • Digital Edition
    • Subscribe
    • Newsletters
    • Mobile Apps
  • TRANSPORTATION
  • MATERIAL HANDLING
  • TECHNOLOGY
  • LIFT TRUCKS
  • PODCAST ETC
    • Podcast
    • Webcasts
    • Blogs
      • Analytics & Big Data
      • Best Practices
      • Change Me
      • Empowering Your Performance Edge
      • Logistics Problem Solving
      • One-Off Sound Off
      • Public Sector Logistics
      • Two Sides of the Logistics Coin
      • Submit your blog post
    • Events
    • White Papers
    • Industry Press Room
      • Upload Your News
    • New Products
      • Upload Your Product News
    • Conference Guides
    • Conference Reports
    • Newsletters
    • Mobile Apps
  • DCV-TV
    • DCV-TV 1: News
    • DCV-TV 2: Case Studies
    • DCV-TV 3: Webcasts
    • DCV-TV 4: Viewer Contributed
    • DCV-TV 5: Solution Profiles
    • MODEX 2020
    • Upload Your Video
  • MAGAZINE
    • Current Issue
    • Archives
    • Digital Edition
    • Subscribe
    • Newsletters
    • Mobile Apps
  • TRANSPORTATION
  • MATERIAL HANDLING
  • TECHNOLOGY
  • LIFT TRUCKS
  • PODCAST ETC
    • Podcast
    • Webcasts
    • Blogs
      • Analytics & Big Data
      • Best Practices
      • Change Me
      • Empowering Your Performance Edge
      • Logistics Problem Solving
      • One-Off Sound Off
      • Public Sector Logistics
      • Two Sides of the Logistics Coin
      • Submit your blog post
    • Events
    • White Papers
    • Industry Press Room
      • Upload Your News
    • New Products
      • Upload Your Product News
    • Conference Guides
    • Conference Reports
    • Newsletters
    • Mobile Apps
  • DCV-TV
    • DCV-TV 1: News
    • DCV-TV 2: Case Studies
    • DCV-TV 3: Webcasts
    • DCV-TV 4: Viewer Contributed
    • DCV-TV 5: Solution Profiles
    • MODEX 2020
    • Upload Your Video
Home » Forming Method of Large Diameter Straight Seam Welded Pipe
Press releases are provided by companies as is and have not been edited or checked for accuracy. Any queries should be directed to the company issuing the release.

Upload your press release

Forming Method of Large Diameter Straight Seam Welded Pipe

Forming Method of Large Diameter Straight Seam Welded Pipe
September 23, 2020
No Comments

The forming process methods of large-diameter longitudinally welded pipes(LSAW) mainly include: UOE forming method, JCOE forming method, CFE row roll forming method, RBE roll forming method and C forming method, etc. They are briefly introduced as follows:

1. UOE forming method: After planing or milling the wide and thick steel plate (welding the pilot arc plate before milling), pre-bend the edge on a pre-bending machine, press it into a U-shape on a U-shaped press, and then It is pressed into an O-shaped tube on an O-shaped press. After pre-welding, the tube is sent to several welding lines to weld the inner and outer grooves to form steel pipes. The steel pipe is expanded and sizing, and the dimensional accuracy is improved. After the welding seam passes various inspections, the inner and outer surfaces are coated with an anti-corrosion layer. UOE process equipment chooses steel plate milling machine, pre-bending machine, U-shaped press, O-shaped press, pre-welding machine, internal and external welding machine, pipe expanding machine, non-destructive testing equipment, hydraulic testing machine and internal and external coating of pipe and tube Equipment etc.

2. JCOE forming method: After the steel plate is pre-bent at the end by the pre-bending machine, half of the steel plate is gradually pressed from one side into a J-shape, and then the other half is gradually pressed into a C-shape from one side. After the middle pressing An O-shaped open tube blank is formed, which is welded by a steel pipe welding pre-welding machine, and then welded by an automatic submerged arc welding internal and external welding machine to form a steel tube.

3. CFE row-roll forming method: the row-roll forming machine is composed of a pre-forming frame, a flat roll frame, an edge bending roll and a small-row roll frame. Since many small rows of the same rollers are set, the steel plate is formed during the forming process. The trajectory of the edge is almost straight, avoiding the phenomenon of "edge stretching". The forming quality of CFE method is good, and its product quality is no different from UOF method. This method uses hot rolled strip steel coils as raw materials, which is different from other forming methods. It is mainly used for the production of large-scale, single-quality steel pipes, but it is difficult to produce high-strength thick-wall steel pipes and large-diameter steel pipes.

4. RBE roll forming method: During roll forming, the steel plate is rolled between three or four rolls for many times. The welded pipe produced by this method is close to UOE welded pipe in terms of performance and reliability. RBE method The investment is small, the output is moderate and the flexibility is large, and it is adaptable to the market.

5. C forming method: replace the U press and O press in the UOE production line with two C forming machines. The forming process is: the pre-bent steel plate is first formed into half of the steel plate on the first press, and then The other half of the steel plate is formed on the other side of the press to obtain an O-shaped round tube. The welded pipe produced by C forming method is of suitable size, moderate output, and the production line price is low.

https://www.permanentsteel.com/productshow/erw-steel-pipe.html
Submit your logistics, material handling, or supply chain related company news in DC VELOCITY's Industry Press Room section or New Products section
Material Handling Publications & Associations Supply Chain Strategy
KEYWORDS Permanent Steel Manufacturing Co.,Ltd
  • Related Articles

    Comparison of ERW Welded Pipe and Seamless Steel Pipe (tested by PetroChina Pipe Institute)

    Comparative Analysis of Seamless Casing Pipe and ERW Casing Pipe

You must login or register in order to post a comment.

Report Abusive Comment

Most Popular Articles

  • A look into the future of robotics

  • A primer on warehouse robots

  • Exotec Skypod System Adopted by Gap Inc. to Optimize Returns Process

  • Roadrunner Freight bolsters LTL capabilities with $50 million in new backing

  • Truck driver availability tightens to three-year low, ACT says

Now Playing on DCV-TV

D5269224 a7c6 4a7c 9d80 58b9942ab005

Mitco Global Los Angeles

DCV-TV 4: Viewer Contributed
The slow down with port and rail in Long Beach have your your buyers and planners on your back. Check out the Mitco Speed to Market solution, where we have your goods in route to your customers or DC within three days of release!

FEATURED WHITE PAPERS

  • Special Report: Supply Chain Trends in Retail & Consumer Goods

  • Fortify Your Operational Resilience

  • Cold Storage Automation: Leveraging Advanced Technologies to Meet Increasing Demand

  • The modern warehouse: Maximizing productivity and capacity

View More

Subscribe to DC Velocity Magazine

GET YOUR FREE SUBSCRIPTION
  • SUBSCRIBE
  • NEWSLETTERS
  • ADVERTISING
  • CUSTOMER CARE
  • CONTACT
  • ABOUT
  • STAFF
  • PRIVACY POLICY

Copyright ©2021. All Rights ReservedDesign, CMS, Hosting & Web Development :: ePublishing